What must be identified
Record the property, door or reader use, a verified system reference and a working credential. Photographs help with construction, but cannot prove the internal technology.
Separate three decisions
Technology, physical construction and artwork are separate approvals. A luxury surface does not establish read performance, and a compatible technology does not approve a material.
Use a controlled sample
Where uncertainty remains, test the final proposed construction in the intended environment. Record the sample revision and do not substitute components after approval.
Release production in writing
The quotation and proof should capture quantity, artwork revision, numbering, encoding responsibility, packing and delivery destination.


